TITLE: Danbury High School Classroom Additions, Phase IV
BUDGET: $2.4 Million
DATE: 2016-2018
Sitework for expansion of new school addition at Danbury High School. Giordano’s scope of work consisted of layout, site demolition, site preparation, temporary sidewalks & construction fencing, removal of above and below grade site improvements, removal and replacement of unsuitable material; excavation and backfilling, trenching and backfilling for all trades, shoring and underpinning, earthwork, site water distribution and drainage, fire hydrants, vapor barriers, molded- sheet panels, perimeter insulation, perimeter under-slab and foundation insulation foundation drainage, structural concrete, all site utilities, cast-in-place concrete sidewalks/curbs/ walkways/ramps, chain link fencing, asphalt paving and curbs, pavement markings, tactile warning strips, traffic signage, and landscaping.Download More Info
Additional Photos:
Phone
(203) 488-7264
Fax
(203) 481-5764
Email
info@giordano.build
Main Office
221 Montowese St.
PO Box 802
Branford, CT 06405